← Oil Rig Regatta

Who's Winning

Updated through Checkpoint 2. The race began in July 2025 and is currently in its second year. Standings are determined by checkpoints reached, with cumulative barrels produced as the tiebreaker.


Leaderboard

Race scoring: 1 point per checkpoint reached + 1 point per 100 million barrels drilled. In the event of a tie, the Race Stewards will deliberate.

⚠ Race production for Harmony, Heritage, and Hondo is credited from March 14, 2026 (federal Defense Production Act restart order). Platforms were offline since 2015.

# Platform Owner Race Production Top Speed Checkpoints Career Barrels Status
1 Platform Harmony "The Largest" Sable Offshore Corp. 0.002 kn 1 / 4 580 million bbl Racing
2 Platform Heritage "The Heir" Sable Offshore Corp. 0.008 kn 1 / 4 420 million bbl Racing
3 Platform Hondo "The Deep One" ExxonMobil Corp. 0.005 kn 1 / 4 300 million bbl Racing
4 Platform Gail "Gale Force" Sable Offshore Corp. 0.014 kn 1 / 4 210 million bbl Racing
5 Platform Hidalgo "El Padrino" Sable Offshore Corp. 0.003 kn 1 / 4 180 million bbl Racing
6 Platform Holly "The Holly Roller" Sable Offshore Corp. Unmeasured 0 / 4 1.1 billion bbl Retired

* Top speed figures are self-reported by competing platforms and have not been independently verified. Race officials have described verification as "structurally impractical." † Race production is a live estimate based on each platform's average daily output since race start (July 4, 2025).


Official Race Stewards Determinations

The following questions have been formally submitted to the Oil Rig Regatta Race Stewards and decided by majority vote. Determinations are binding and final. They are published in the interest of transparency.

Does passive movement caused by tidal forces, storm surge, or ocean current count toward a platform's race distance?
Ruling 2025-01 — Decided: No

Locomotion must be intentional, directed, and conducted by the platform's registered support fleet. Tidal forces acting on a moored platform do not constitute forward progress. A platform may not claim race distance for movement it did not plan, pay for, or instruct. The Race Stewards note that this determination eliminates the only avenue by which any platform has moved since the race began.

If a platform's support vessel reaches a destination wellbore ahead of the platform, is the checkpoint credited to the platform?
Ruling 2025-02 — Decided: No

Checkpoints are credited to platforms, not to support vessels. A support vessel reaching a wellbore does not constitute a platform arrival. The Race Stewards acknowledge that this ruling closes a loophole that, at the time of drafting, no team had yet attempted to exploit.

Does Platform Holly's decommissioning constitute a retirement or a disqualification? Is there a difference?
Ruling 2025-03 — Decided: Retirement, with distinction

Disqualification implies a rules violation. Platform Holly violated no rules. She was decommissioned pursuant to federal regulatory requirements, a circumstance beyond the platform's control. The Race Stewards have entered Holly into the official record as a retired competitor with full honors, noting that her career barrels of 1.1 billion represent the largest single-platform production total among all registered competitors.

Must a platform visit wells in geographic sequence, or may it visit any wellbore anywhere in the Channel?
Ruling 2025-04 — Decided: Any wellbore, with restrictions

Platforms may visit any named wellbore in the Santa Barbara Channel, subject to existing regulatory permits, operator agreements, and Race Stewards approval. The four race checkpoints — Newport Beach, Santa Barbara, Morro Bay, and Monterey — must be reached in order. A platform may visit any number of intermediate wellbores between checkpoints by any route it chooses.

What is the minimum number of barrels a well must have produced historically to qualify as a race waypoint?
Ruling 2025-05 — Decided: One (1)

The Race Stewards have declined to impose a minimum production threshold for qualifying wellbores. Any named wellbore with an established wellhead and a valid API well number is eligible. The determination was reached after two hours of deliberation.